PT. BARRY CALLEBOUT COMEXTRA INDONESIA

  • Steel Structure and Water Storage Tank (IDR 2,036,000,000.00)

 

PT. GOLDEN UNION OIL

  • Fabrication Vessel & Deaerator Buffer Tank (IDR 800,000,000.00)

 

PT. ROBERTS SCAEFER SOROS INDONESIA (USD 17,328,964.00)

  • CV-101 Misc Steel, Portable Splicing Shed and Remaining Steel (USD 1,937,750.00)
  • CV-06 Structural Steel (USD 383,500.00)
  • Plate Work for The CV-115A Crushing Option (USD 7,673,004.00)
  • Structural Steel for The CV-115A Crushing Option (USD 7,334,710.00)


WILMAR GROUP (IDR 55,355,967,000.00)

  • Additional Work Pipe Rack Oleo & Additional Layer Gantry 4 (IDR 109,340,000.00)
  • Structure Equipment in Mes Plant (IDR 5,890,720,000.00)
  • Fondation Pipe Rack, Structure Pipe Rack, and Bundwall Tank Farm ME Fractionation #2 (IDR 1,265,000,000.00)
  • Steel Structure Main Building Fame 2 #Fractionation Plant (IDR 10,800,000,000.00)
  • Civil and Architecture in ME Fract #2 (IDR 1,600,000,000.00)
  • Work Skid Steel Hydrochem Plant (IDR 1,027,000,000.00)
  • Fabrication and Installation of Pipe Rack Jetty Addition Layer (IDR 908,700,000.00)
  • Pfad Plate (IDR 8,955,259,000.00)
  • Palm Kernel Solvent Extraction Plant (IDR 9,661,519,000.00)
  • Expand Finishing Plant (IDR 7,000,000,000.00)
  • Bulk Pellet (IDR 7,674,429,000.00)
  • Preparation Plant (IDR 464,000,000.00)

 

PT. PRIMACIPTA BAJA UTAMA (IDR 4,019,274,098.00)

  • Fabricated Steel Construction Project Hatari Kaltim (IDR 812,179,798.00)
  • Fabricated Steel Construction Project in Melak, South Kalimantan (IDR 160,812,300.00)
  • Fabrication Workshop Sangata (IDR 3,046,282,000.00)

 

PT. TUNGGAL JAYA STEEL

  • Concrete Iron Factory 7192 M2 (IDR 10,327,915,400.00)