PT. BARRY CALLEBOUT COMEXTRA INDONESIA
- Steel Structure and Water Storage Tank (IDR 2,036,000,000.00)
PT. GOLDEN UNION OIL
- Fabrication Vessel & Deaerator Buffer Tank (IDR 800,000,000.00)
PT. ROBERTS SCAEFER SOROS INDONESIA (USD 17,328,964.00)
- CV-101 Misc Steel, Portable Splicing Shed and Remaining Steel (USD 1,937,750.00)
- CV-06 Structural Steel (USD 383,500.00)
- Plate Work for The CV-115A Crushing Option (USD 7,673,004.00)
- Structural Steel for The CV-115A Crushing Option (USD 7,334,710.00)
WILMAR GROUP (IDR 55,355,967,000.00)
- Additional Work Pipe Rack Oleo & Additional Layer Gantry 4 (IDR 109,340,000.00)
- Structure Equipment in Mes Plant (IDR 5,890,720,000.00)
- Fondation Pipe Rack, Structure Pipe Rack, and Bundwall Tank Farm ME Fractionation #2 (IDR 1,265,000,000.00)
- Steel Structure Main Building Fame 2 #Fractionation Plant (IDR 10,800,000,000.00)
- Civil and Architecture in ME Fract #2 (IDR 1,600,000,000.00)
- Work Skid Steel Hydrochem Plant (IDR 1,027,000,000.00)
- Fabrication and Installation of Pipe Rack Jetty Addition Layer (IDR 908,700,000.00)
- Pfad Plate (IDR 8,955,259,000.00)
- Palm Kernel Solvent Extraction Plant (IDR 9,661,519,000.00)
- Expand Finishing Plant (IDR 7,000,000,000.00)
- Bulk Pellet (IDR 7,674,429,000.00)
- Preparation Plant (IDR 464,000,000.00)
PT. PRIMACIPTA BAJA UTAMA (IDR 4,019,274,098.00)
- Fabricated Steel Construction Project Hatari Kaltim (IDR 812,179,798.00)
- Fabricated Steel Construction Project in Melak, South Kalimantan (IDR 160,812,300.00)
- Fabrication Workshop Sangata (IDR 3,046,282,000.00)
PT. TUNGGAL JAYA STEEL
- Concrete Iron Factory 7192 M2 (IDR 10,327,915,400.00)